Members of the Raw Hire team recently visited CITIC Pacific Mining’s (CPM) Sino Iron operation at Cape Preston. The visit was a chance to spend time with the CPM team, learn more about their operation, and see firsthand the scale of the site and what it takes to keep one of Australia’s largest magnetite mines running.
The team was led on a comprehensive tour. It began at the viewing platform overlooking the west pit. The pit is currently 2km long and only around half its planned size, yet it already reaches 200m below sea level.
From there, the team travelled into the pit in one of CPM’s light vehicles. These are fitted with positive-pressure air filtration systems that protect occupants from airborne contaminants. Inside the pit, the team watched the large haul trucks that move magnetite ore around the clock.
Regular site visits are an important part of how Raw Hire works with its clients. Getting out to site helps our team understand operational requirements, maintain strong working relationships and ensure we’re providing the right support where it’s needed.
Thank you to the CPM team for their time and hospitality during the visit.